3 installing the air locker, Approximate backlash shimming – ARB RD166 User Manual

Page 13

Advertising
background image

 3      Installing  the  Air  Locker  

 

 

11

 

 NOTE  :      Make  sure  any  grinding  dust,  filings  or  drill  chips  left  

behind  by  cutting  the  drainage  slots  is  completely  
cleaned  out  of  the  housing.  

 

F

 Check  that  the  axle  air  vents  are  clear  and  working  correctly.  

 

 

3.2

     

Approximate  Backlash  Shimming

 

 

In  order  to  reproduce  a  similar  pre-­load  and  ring  and  pinion  backlash  

in  your  Air  Locker  to  that  of  your  original  differential,  measurements  
need  to  be  taken  so  that  a  shim  thickness  can  be  calculated.    

 

F

 Secure  the  original  differential  to  a  work  bench.  

F

 Remove  the  bolts  that  hold  the  ring  gear  in  place.  

F

 Using  a  plastic  or  copper  hammer,  tap  in  a  circle  around  the  ring  

gear  to  separate  it  from  the  differential  carrier.  

 

 

 
 

 
 
 
 
 
 
 
 
 
 

 
 

 

 
 
 

 Figure  5.  

 
 

 

F

 Assemble  the  original  bearing  cup  onto  the  cone  of  the  right-­hand  

side  of  the  original  differential  carrier.  

 

 

Advertising