Pre-load + end float = shim pack, 3 installing the air locker, Pre-­load shimming – ARB RD166 User Manual

Page 20

Advertising
background image

 3      Installing  the  Air  Locker  

 

 

18

3.6

     

Pre-­Load  Shimming

 

 

In  order  to  pre-­load  the  tapered  roller  bearings  in  your  Air  Locker,  
measurements  need  to  be  taken  so  that  a  value  can  be  calculated  for  

the  shim  thickness  µ'¶  in  Figure  9.  
 

 

F

 Insert  and  hold  the  Air  Locker  into  the  differential  housing.    

F

 Insert  the  shim  pack  determined  earlier  as  µ%¶  between  the  bearing  

cup  (right-­hand  side)  and  the  axle  housing.    

F

 Push  (or  lightly  pry)  the  Air  Locker  hard  across  to  the  right-­hand  

VLGHDQGPHDVXUHWKHPD[LPXPJDS DOVRFDOOHGWKHµHQGIORDW¶ 
between  the  outside  of  the  seal  housing  and  the  inside  face  of  the  
axle  housing  with  an  automotive  feeler  gauge.  (Fig.10.)  

 

 Figure  10.  

 
 
 
 
 
 
 
 
 

 

F

 &RQVXOW\RXUYHKLFOHPDQXIDFWXUHU¶VVHUYLFHPDQXDOWRGHWHUPLQH

the  carrier  bearing  pre-­load  amount  specified  for  your  vehicle.  

F

 Add  the  specified  pre-­load  amount  to  the  measurement  taken  with  

the  feeler  gauge  to  determine  a  shim  amount  for  µ'¶  in  Figure  9.  

 

 

PRE-LOAD + END FLOAT = SHIM PACK

 

 

F

 Create  a  shim  pack  µ'¶  from  the  shims  supplied  with  your  Air  

Locker.  

 

 NOTE  :       A  wide  variety  of  shims  has  been  included  in  the  shim  

kit  for  your  convenience  and  to  cover  various  Dana  60  
applications,  however  it  should  not  be  necessary  to  
use  them  all.
 

 

Advertising