6 testing & final assembly, Post-­installation check list – ARB RD166 User Manual

Page 40

Advertising
background image

 6        Testing  &  Final  Assembly  

 

 

38

6.5

     

Post-­Installation  Check  List    

 

Now  that  the  Air  Locker  installation  has  been  completed,  ARB  
recommends  that  you  take  the  time  to  complete  the  following  check  list  

MXVWWRLQVXUHWKDW\RXKDYHQ¶WPLVVHGDQ\RIWKHYLWDOVWHSV  

 
 

F

 The  air  system  has  been  leak  tested.  

F

 Thread  locking  compound  was  used  on  the  ring  gear  bolts.  

F

 All  torTXHVHWWLQJVFRPSO\ZLWKWKHYHKLFOHPDQXIDFWXUHU¶VVSHFV

and  were  set  with  an  accurate  torque  wrench.  

F

 Differential  fluid  complies  with  ARB  recommendations  and  has  

been  filled  to  the  correct  level.  

F

 All  air  lines  and  wiring  have  been  securely  cable  tied  to  resist  

snagging.    

F

 Switch(es)  have  been  securely  mounted  within  operator  reach,  yet  

well  away  from  danger  of  accidental  engagement.  

F

 Switch(es)  function  properly  and  illuminate  to  indicate  that  Air  

Locker(s)  are  engaged.  

F

 All  operators  who  are  to  use  the  Air  Locker  have  read,  and  fully  

understand  the  ARB  Air  Locker  Operating  &  Service  Manual.  

F

 The  Air  Locker  Warning  Sticker  has  been  located  within  close  

proximity  of  the  actuator  switch(es).  

 
 

INSTALLATION  PERFORMED  BY:  

DATE  OF  INSTALLATION:  

ODOMETER  READING:  

ARB  AIR  LOCKER  SERIAL  No:  

 

___________________________  

___________________________    

___________________________      

___________________________      

 

 

 

Advertising