ዐ - ዏ . installing the flange nut, ዐ - ዐ . installing the control box – Brother HE-800A User Manual

Page 17

Advertising
background image

HE-800A

4. INSTALLATION

9

-. Installing the flange nut

Install the four flange nuts (1) to the underside of the

work table.

Note:

When the machine head is positioned horizontally,

some flange nut installation locations may be

inaccessible after the control box has been installed.

-. Installing the control box

Note: When opening the cover, hold it securely so that it does not fall down.

1. Remove the 12 screws (1), and then open the covers (main P.C. board mounting plate (2) and sub P.C. board

mounting plate (3)).

2. Install the control box with the bolts (4), cushions (5), cushion collars (6), rubber collars (7), flat washers (8) and nuts

(9) as shown in the illustration. At this time, leave a gap of approximately 2 mm between the work table and the top

of the box.

3. Close the covers (main P.C. board mounting plate (2) and sub P.C. mounting plate (3)), and provisionally tighten

them with the screws (1). (They will be opened again when the cords are connected.)

3858Q

3857Q

Advertising