SECTION 5 - MAST COMPONENTS

3121231

– JLG Lift –

5-29

5.11 GATE ALARM - INSTALLATION - OPTION

(FOR SIDE ENTRY W/FOLDING
MATERIAL TRAY PLATFORM ONLY)

NOTE: Machine must have v6.11 or higher software in the

Ground Control Module.

Ground Control Module Programming settings required:

• Set Ancillary 1 POL to HIGH (Up Arrow)
• Set AUX 1 INHIBIT to 5

Switches and Wiring

Proximity Switch Wire Harness Routing

Proximity Switch Wiring

1. Connector

2. Splice

3. Proximity Switches

Proximity Switch Location

1. Platform Vertical Rail

2. Left Platform Gate

3. Lower Gate Stop

4. Proximity Switch (a)

NOTE: (a) There are two proximity switches, one on each

gate mounted in the lower gate stop.

Platform Junction Box

1. Platform Upper Rail

2. Mast Header

3. Platform Junction Box

4. AUX 1 Connector