8 msp - stockpicker platform - installation, 8 msp - stockpicker platform - installation -27, Msp - stockpicker platform installation -27 – JLG 15/20MSP Service Manual User Manual

Page 117

Advertising
background image

SECTION 5 - MAST COMPONENTS

3121231

– JLG Lift –

5-27

5.8 MSP - STOCKPICKER PLATFORM - INSTALLATION

Figure 5-8. MSP - StockPicker Platform Installation.

1. Mast Platform Header Section

2. Nut

3. Washers

4. Hex Head Screws (2 inch)

5. Hex Head Screws (2-1/2 inch)

6. Platform Bumper Rest (a)

Note: (a) Once mounted, adjust bumper rests on both sides evenly so the platform rests on the bumpers when in stowed position.

1

6

5

2

3

4

Advertising
This manual is related to the following products: