Connector lay–out (4-channel version), Status led indicators – 2N VoiceBlue Next v3.6 User Manual
Page 11
Advertising
11
Connector Lay–Out (4-Channel Version)
The following connectors are mounted on the
bottom:
2N VoiceBlue Next
®
10/100BaseT Ethernet connector with PoE support
RESET button – press for a short time to restart the GSM gateway and for a long
time to restart the GSM gateway and download the factory settings.
Antenna connector for all GSM/UMTS channels
SIM holder
Find a power supply connector (DC Jack 2.1mm) and type plates at the rear.
Status LED Indicators
The
states are indicated by LEDs on the front and system
2N VoiceBlue Next
®
connector sides. For the LED types see the table below.
Advertising