Connector lay–out (4-channel version), Status led indicators – 2N VoiceBlue Next v3.6 User Manual

Page 11

Advertising
background image

11

2N TELEKOMUNIKACE a.s., www.2n.cz

®

Connector Lay–Out (4-Channel Version)

The following connectors are mounted on the

bottom:

2N VoiceBlue Next

®

10/100BaseT Ethernet connector with PoE support
RESET button – press for a short time to restart the GSM gateway and for a long
time to restart the GSM gateway and download the factory settings.
Antenna connector for all GSM/UMTS channels
SIM holder

Find a power supply connector (DC Jack 2.1mm) and type plates at the rear.

Status LED Indicators

The

states are indicated by LEDs on the front and system

2N VoiceBlue Next

®

connector sides. For the LED types see the table below.

Advertising