Wall mounting (2-channel version) – 2N VoiceBlue Next v3.6 User Manual

Page 17

Advertising
background image

17

2N TELEKOMUNIKACE a.s., www.2n.cz

®

1.

2.

higher than with mobile phones as, generally, gateways shared by multiple users
show a very high traffic.
Make sure that the VoIP connection has been configured properly according to
the SIP and other VoIP recommendations.
It is recommended that the power supply adapter should be connected to a
network with a UPS back-up and due overvoltage protection.

Wall Mounting (2-Channel Version)

Follow the instructions below to wall mount

:

2N VoiceBlue Next

®

Drill two screws into the wall in a relative distance matching the wall mounting
holes in the

rear.

2N VoiceBlue Next

®

The maximum screw head – wall

distance is 5mm.
Hang the

unit onto the pre-drilled screws.

2N VoiceBlue Next

®

Caution

Do not open the GSM gateway during wall mounting to avoid product
damage and subsequent warranty invalidation!
The screw head – wall distance must allow for simple handling such as
removing from the wall.

Advertising