INFICON CrystalSix Sensor User Manual

Page 29

Advertising
background image

2 - 15

IP

N 07

4-

15

5L

CrystalSix Operating Manual

2.7 CrystalSix Sensor Requirement when Not Installed with an

IC/5, XTC/2, XTC/C, IC/4, or IC/4 PLUS

The CrystalSix can be manually operated with other Deposition Controllers. The
user must, however, be aware of the functional requirements for operation. These
include, but are not limited to:

1

The solenoid assembly must be energized and de-energized twice per crystal
position. Twelve pulses complete one revolution.

2

The electrical pulse applied to the solenoid valve must be at least one second
in duration during both the pressurization and de-pressurization phase.

3

A 24 volt AC or DC supply is required to energize the solenoid assembly.
Consult

Figure 3-1 on page 3-4

for wiring assignments.

4

The user should provide some means of determining the quantity of “good”
crystals when initially loaded, and quantity of good crystals remaining at any
time.

5

Follow the guidelines shown in

section 2.3 on page 2-6

for installation.

6

You will need to keep track of the total thickness as a manually generated sum
of the deposit accumulated on each crystal.

Advertising