3 unpacking and installation, Unpacking and installation, Instrument setup – Leica Biosystems RM2235 User Manual

Page 16

Advertising
background image

14

Instructions for Use V 1.8 RevC – 09/2013

4.3 Unpacking and installation

Fig. 6

Fig. 7

1

2

3

4

4

4

4

5

Loosen and unscrew the six upper

screws (2).

• Remove the cover (1).
• Take the accessory carton (optional ac-

cessories) (3) and the cartons (4) from

the standard scope of delivery.

4.

Instrument Setup

When the instrument is delivered, check the tilt indicators on the

packaging.

If the arrowhead is blue, the shipment was transported laying flat,

was tilted at too great an angle or fell over during transport.

Note this on the shipping documents and check the shipment for

possible damage.

The transport crate and in-

cluded retaining elements

should be kept in case a re-

turn shipment is necessary

later.

Advertising