Lenze E94AZPS User Manual

Page 41

Advertising
background image

Electrical installation

Wiring

Terminal assignment

4

l

41

EDK94ZPS113 DE/EN/FR/ES/IT 4.0

1

2

SSP94IT001

Fig. 4−3

Plugging the IT insulating cap onto the earthing jumper

Proceed as follows to disconnect the internal connection between the filters
and PE:
1. Remove IT insulating cap from the parking position

 in the installation

backplane.

–

For this apply a screwdriver on the right or left and lever off the
insulating cap.

–

Optionally the insulating cap can be carefully removed using an
appropriate pliers.

2. Attach IT insulating cap to the earthing jumper

‚ until it clicks into place.

Mains

Terminal X100
(left part)

Labelling

Description

L1
L2
L3

Connection of the mains phases L1, L2, L3

SSP940X100

+

Connection for the supply−side PE conductor with
M5 ring cable lug

Advertising