Lenze E94AZPS User Manual
Page 41
Advertising

Electrical installation
Wiring
Terminal assignment
l
41
EDK94ZPS113 DE/EN/FR/ES/IT 4.0
1
2
SSP94IT001
Fig. 4−3
Plugging the IT insulating cap onto the earthing jumper
Proceed as follows to disconnect the internal connection between the filters
and PE:
1. Remove IT insulating cap from the parking position
in the installation
backplane.
–
For this apply a screwdriver on the right or left and lever off the
insulating cap.
–
Optionally the insulating cap can be carefully removed using an
appropriate pliers.
2. Attach IT insulating cap to the earthing jumper
until it clicks into place.
Mains
Terminal X100
(left part)
Labelling
Description
L1
L2
L3
Connection of the mains phases L1, L2, L3
SSP940X100
+
Connection for the supply−side PE conductor with
M5 ring cable lug
Advertising