Lenze E94AZPS User Manual

Page 41

Advertising
background image

Electrical installation

Wiring

Terminal assignment

4

l

41

EDK94ZPS113 DE/EN/FR/ES/IT 4.0

1

2

SSP94IT001

Fig. 4−3

Plugging the IT insulating cap onto the earthing jumper

Proceed as follows to disconnect the internal connection between the filters
and PE:
1. Remove IT insulating cap from the parking position

 in the installation

backplane.

For this apply a screwdriver on the right or left and lever off the
insulating cap.

Optionally the insulating cap can be carefully removed using an
appropriate pliers.

2. Attach IT insulating cap to the earthing jumper

‚ until it clicks into place.

Mains

Terminal X100
(left part)

Labelling

Description

L1
L2
L3

Connection of the mains phases L1, L2, L3

SSP940X100

+

Connection for the supply−side PE conductor with
M5 ring cable lug

Advertising