Initial switch-on, Initial switch−on – Lenze EMF2179IB User Manual

Page 70

Advertising
background image

7

Commissioning

Initial switch−on

EDKMF2179 DE/EN/FR 4.0

70

l

H2_FirstOn−unkontroll_Anlauf

Initial switch−on

)

Note!

Follow the commissioning steps in the given order!

1. Switch on the standard device and, if necessary, the external voltage supply of the

communication module.
– The green LED

0 (connection status to the standard device) on the front of the

communication module is lit.

– The LED

1 (connection status to the bus) on the front of the communication

module is blinking green.

– The green status LED of the standard device (Drive LED)

2 has to be lit or blinking.

The meaning of the signalling can be found in the documentation of the standard
device.

2. Use the configuration software (e.g. »RSNetWorx«) to integrate the communication

module into the DeviceNet.
– The status of the LED

1 (connection status to the bus) changes from "blinking" to

"ON" when the communication module has been configured.

3. It is now possible to communicate with the drive, i.e.

– Via "explicit messages" you can read and write all parameters from the drive

and/or communication module.

– You can read actual values (e.g. status words) or write setpoints (e.g. frequency

setpoints).

Advertising