Caution – MK Diamond PX-3 User Manual

Page 18

Advertising
background image

18

SETUP

PRE-START INSPECTION
The pre-start inspection should be performed before beginning any job.


CAUTION

Before powering or starting, check for damage that could prevent this equipment from proper operation

or performing its intended function. Check for binding and alignment of moving parts. Check for damaged,

broken or missing parts.
Verify the trigger switch-locking button is in the RELEASE position.
Before connecting the PX-3 to a power supply, be sure the voltage, cycle and phase of the job site power

source meet the following requirements:

If using an extension power cord, make sure the length and wire gauge corresponds to the requirements

listed in the table on page 9. An extension power cord that is too small in wire gauge (diameter), or too long

in length, will cause the motor to overheat and could cause premature failure.
DO NOT cover the motor vents. This could lead to motor overheating.

Fig. 14 Pre-start Inspection Locations

VOLTAGE

120V

CYCLE

60 Hz

PHASE

1-PHASE

PORTABLE GENERATOR
If using a portable generator to provide power, ensure the generator meets the following minimum requirements:

8kW

120V/240

66.7/33.3 AMPS

SINGLE PHASE

CAUTION

In order to avoid breaker tripping, a 20-amp circuit breaker should be used.
If the Diamond Blade shows signs of fatigue cracking, replace the Blade before starting work. See the Diamond

Blade Change Out section on Page 24.

1.
2.
3.
4.

Inspect the Blade for damage. Verify the Blade is correct for the material being cut (Figure 14).
Inspect the PX-3 for damage.
Inspect the Motor Air Filter for cleanliness.
Verify the Trigger Switch is unlocked.

1

2

3

4

PX-3 PAVER EXTREME

INSPECTION & SET-UP

Advertising