Setup, startup, adjustment, operation and shutdown, Iii. dry blade operation – MK Diamond MK-2005G User Manual
Page 17
MK-2005G
Revision 12/00, Effective Date December 26, 2000
Page 17
SETUP, STARTUP, ADJUSTMENT, OPERATION and SHUTDOWN
III. Dry Blade Operation:
NOTE: Failure to perform the following steps will lead to premature pump failure.
(C)
Pivot front of Water Pump Drive
End Pivot Plate up and tighten
the retaining bolts
(B)
Loosen Water Pump Drive End
Pivot Plate front and rear
retaining bolts
(A)
Identify Water Pump Drive
End Pivot Plate
(F)
Move Water Pump Assembly
to the outside of the
Water Basin
(E)
Loosen and remove Water
Pump adjustment clamp,
wing nut and bolt
(D)
Remove the Splash Curtain
(G)
Remove Water Basin
Clean Water
Pivot Plate
Retaining Bolts
9/16-inch
Wrench
Pivot Up
9/16-inch
Wrench
Splash Curtain
Curtain Rod
Loosen Wing Nut
Remove Water Pump
Water Pump
Slide Water Basin
out back Of Saw
(D)
Fill the Water Basin
with clean water