Setup, startup, adjustment, operation and shutdown, Iii. dry blade operation – MK Diamond MK-2005G User Manual

Page 17

Advertising
background image

MK-2005G

Revision 12/00, Effective Date December 26, 2000

Page 17

SETUP, STARTUP, ADJUSTMENT, OPERATION and SHUTDOWN



















III. Dry Blade Operation:

NOTE: Failure to perform the following steps will lead to premature pump failure.


















































(C)

Pivot front of Water Pump Drive

End Pivot Plate up and tighten

the retaining bolts

(B)

Loosen Water Pump Drive End

Pivot Plate front and rear

retaining bolts

(A)

Identify Water Pump Drive

End Pivot Plate

(F)

Move Water Pump Assembly

to the outside of the

Water Basin

(E)

Loosen and remove Water

Pump adjustment clamp,

wing nut and bolt

(D)

Remove the Splash Curtain

(G)

Remove Water Basin

Clean Water

Pivot Plate

Retaining Bolts

9/16-inch

Wrench

Pivot Up

9/16-inch

Wrench

Splash Curtain

Curtain Rod

Loosen Wing Nut

Remove Water Pump

Water Pump

Slide Water Basin

out back Of Saw

(D)

Fill the Water Basin

with clean water

Advertising