MacDon PW7 Pick-Up Header User Manual

Page 26

Advertising
background image

SECTION 3 – SETUP COMPLETION

Form 169149

Revision E

20

G

E

A

B

H

H

J

K

g) Push up on handle (A) on combine so that

hooks (B) from photo on page 2 engage
header lower mounting pins (K) on both
sides of the feeder house.

h) Be sure slot in lever (E) engages welded rod

on handle (A) to lock handle in place.

i) If hook (B) does not fully engage header

lower mounting pin (K) on both sides of the
feeder house when (A) and (E) are engaged,
adjust position of mounting pin (K) in slot as
required.
If force to engage handle (A) and lever (E) is
too loose or excessive, loosen bolts (G), and
adjust lock force as required. Re-tighten
bolts.
























j) Connect Hydraulic Multi-coupler at (H) and

electrical harness at (J).




























k) Disengage the feeder house locks and secure

in the storage position.











Disengaged Feeder House Lock

(May not be exactly as shown)

Advertising