Setup – SATEC C191HM User Manual

Page 8

Advertising
background image

v

SETUP

(see Chapter 4 for full instructions)

Setups can be performed directly on the front panel
or via PComTest communication software.

Press .
Press to activate middle window.
Press

⇑ ⇓ to scroll to desired option.

Press to activate lower window.
Press

⇑ ⇓ to scroll to desired value.

Press to save selected value.

Basic and Communications Default Setups

Code

Parameter

Options

Description

ConF

Wiring mode

4Ln3

4-wire Wye using 3 PTs (3 element), line to
neutral voltage readings

Pt

PT ratio

1.0

The phase potential transformer ratio

Ct

CT primary current

5

The primary rating of the phase current
transformer, A

d.P

Power demand
period

15

The length of the demand period for power
demand calculations, in minutes. E = external
synchronization

n.dp

Number of power
demand periods

1

The number of demand periods to be averaged
for sliding window demands
1 = block interval demand calculation

A.dP

Ampere/Volt
demand period

900

The length of the demand period for
volt/ampere demand calculations, in seconds
0 = measuring peak current

buF

Averaging buffer
size

8

The number of measurements for RMS sliding
averaging

rSt

Reset
enable/disable

diS

Protects all reset functions, both via the front
panel or communications.

Freq

Nominal frequency

50/, 60

The nominal power utility frequency, Hz

LoAd

Maximum demand
load current

0

The maximum demand load current used in
TDD calculations (0 = CT primary current)

Prot

Communications
protocol

ASCII

ASCII protocol

Addr

Address

0 (ASCII)

Powermeter address

bAud

Baud rate

9600

9600 bps

dAtA

Data format

8n

8 bits, no parity

CPtb

ASCII compatibility
mode

diS

Disables ASCII compatibility mode (For more
information, see ASCII Communications
Protocol Reference Guide)

Port

ASCII

Prot

menu

option

value

bASc

4L-n

ConF

menu

option

value

SELECT

CHG

ENTER

SELECT

SELECT

ENTER

Advertising