Quick start guidelines, Installation, 15 installation – Rockwell Automation 1404-M4_M5_M6_M8 Powermonitor 3000 Installation Instructions, PRIOR to Firmware rev. 3.0 User Manual

Page 15

Advertising
background image

Publication 1404-IN007D-EN-P - October 2004

Powermonitor 3000 15

Quick Start Guidelines

The Powermonitor 3000 may be used in many electric power
monitoring and control systems. Whether your Powermonitor 3000 is
a complete power and energy monitor or a component in a plant- or
enterprise-wide energy management system, there are a few basic
steps to follow to make your unit operational.

1. Install your Powermonitor 3000 master module within a suitable

enclosure. Refer to Installation on page 15.

2. Install your optional Display Module. Refer to the Installation

Instructions included with the Display Module, publication
1404-IN005.

3. Determine your Wiring Mode and install wiring between the

Powermonitor 3000 and your power system. Connect control
power wiring, preferably from a separate source of control
power. If used, connect wiring to the status inputs, Form C
control relay, and KYZ solid-state outputs. Refer to Wiring of
Master Module on page 20
.

4. Configure the potential transformer (PT) and current transformer

(CT) ratios to match those used in your power system
connections. Configure the Voltage Mode of the Powermonitor
3000 to match your power system configuration.

5. Configure Powermonitor 3000 communications. This step varies

depending upon the communications option you have selected.

6. Configure other optional performance features such as Setpoint

Control, Data Logging, etc.

Refer to the Powermonitor 3000 User Manual, publication
1404-UM001, for complete information on configuring and operating
your Powermonitor 3000.

Installation

Only qualified personnel should install, wire, service and maintain this
equipment. Refer to and follow the safety guidelines found starting at
page 6 and pay attention to all warnings and notices in these
instructions.

Advertising