5. Check height of feeder in relationship to

register by placing a 1mm thick (approx.) object

that will sit on top of register ribs without being

held. A common 12 inch scale placed at an angle

on top of the register ribs is a good example of

what to use. The top surface of the 1mm thick

object should be in line with the top surface of

rake plate fingers on the pile feeder. Adjust casters

on pile feeder accordingly to achieve this height

relationship between the pile feeder and register.

6. Level the feeder by adjusting casters on

pile feeder accordingly. Once pile feeder has been

leveled, lock the height adjustment in place by

locking the nuts on the casters down on the feeder

tie bars.

7. Hook up air blow and vacuum hoses

on feeder to corresponding holes on 1st station

8. Connect double sheet detector cable on

pile feeder to double sheet detector on register.

9. Connect communication cable on pile

feeder to connector on 1st station folding unit. The

connector on 1st station folding unit is the same

(9) pin connector used for connecting the short pile

feeder table.

10. The pile feeder is designed to provide

electrical power to both the 1st and 2nd station

folding units. The receptacles for the 1st and 2nd

station folding units are located on the operator

side guard. Plug the 1st and 2nd station folding

units into the receptacles provided on the pile

feeder.

11. Plug the pile feeder into the proper type

and size of wall receptacle. Refer to page #9 of

this manual for electrical requirements.