4 diagnostic tests / validation / glp, Diagnostic tests / validation / glp – Metrohm 761 SD Compact IC User Manual

Page 114

Advertising
background image

6 Notes – Maintenance – Faults

761 SD Compact IC / Instructions for Use 8.

761.1043

106

6.4

Diagnostic tests / Validation / GLP

The requirements of GLP (Good Laboratory Practice) include a peri-

odic check of analytical measuring instruments with regard to their re-

producibility and accuracy using Standard Operating Procedures,

SOP.
Under the title «Application Bulletin No. 277 – Validation of

Metrohm ion chromatographs» an example of such a standard op-

erating procedure is available from Metrohm; it can be adapted and

used with the 761 SD Compact IC.
Further information on the subjects of QA, GLP and validation can also

be found in the brochure «Quality management with Metrohm»,

which is available from your local Metrohm agency.
Testing of the electronic and mechanical function groups of Metrohm

instruments can and should be performed as part of a regular service

by trained personnel of the manufacturing company (see section 6.2.1).

All Metrohm instruments are equipped with start-up-test routines which

check for perfect functioning of the relevant assemblies when the in-

strument is switched on. If no error message is displayed, it may be as-

sumed the instrument is operating without faults.
The Metrohm company also supplies its instruments with an integrated

diagnostic program which, in the case of possible malfunctions or faulty

behaviour, allows the service technician to check the functioning of cer-

tain assemblies and localize the fault.


Advertising