124 is connected here – Metrohm 844 UV/VIS Compact IC User Manual

Page 57

Advertising
background image

2.8 Columns

844 UV/VIS Compact IC / Gebrauchsanweisung 8.844.1051

45

117 Cover of column heating

121 Feedthrough

for column inlet capillary 47/110

122 Connection capillary

PEEK Capillary 6.1831.120, for the

connection to the detector

length L = 45 cm

123 Connection capillary

PEEK Capillary 6.1831.120, for the

connection to the post column reactor

length L = 45 cm

124 Connection capillary

Steel capillary 6.2620.160, for

connection to the detector
Lentth: L=30=cm

125 Holder plate

for separating column

126 Capillary prewarming

for column connection capillary

47/110

1 Open the column heating

• Unscrew the two knurled screws 116 and remove cover 117

from the column heating.

2 Prepare column heating

• Lead column inlet capillary 47/110 through feedthrough 121

into the column heating.

• Push column inlet capillary 47/110 into the outer one of the

two capillary prewarming slots 126 of the channel you have

selected. Push column inlet capillary 47/110 under holder

plate

125 until it appears at the other end.

• Now bend column inlet capillary 47/110 and push it through

the inner capillary prewarming slot 126 alongside until it

appears at the other end.

• Lead connection capillary 123/124 (without post column

reactor) or 123 (with post column reactor) outward through

feedthrough

111 using a compression fitting 64 (6.2744.010)

and provide it with a compression fitting 64 6.2744.010 on the

inside.

If not much space is available then the

6.2744.070 PEEK

compression fitting short contained in the standard equipment can

also be used for attaching the PEEK capillary.

Advertising