Periodic checkout procedures, 1 schedule of checkouts, 2 trip test – Banner EZ-SCREEN­ Safety Light Curtain Systems User Manual

Page 50

Advertising
background image

48

P/N 68413 rev. A

Banner Engineering Corp.

Minneapolis, U.S.A.

www.bannerengineering.com • Tel: 763.544.3164

EZ-SCREEN Point

Instruction Manual

Periodic Checkout Procedures

Study each procedure from beginning to end before you

start to make sure that you understand each step. Refer all

questions to the Banner Applications Engineering Department at 

the address or numbers listed on the front cover of this manual. 

Checkouts must be performed as detailed in Section 6.1 below 

and results should be recorded and kept in the appropriate

place (e.g., near the machine, and/or in a technical file).
NOTE: If multiple EZ-SCREEN Point Systems are combined

to form a light grid, each individual System must be

tested.

6.1 Schedule of Checkouts

Initial Checkout: The procedure for initial checkout of the

EZ-SCREEN Point System is described in Section 3.6. This 

procedure is performed at installation, and at any time the 

System, the guarded machine, or any part of the application 

is installed or altered . The procedure must be performed by a

Qualified Person.
Commissioning Checkout: Should be performed at installation

or whenever changes are made to the system (either a new 

configuration of the EZ-SCREEN System or changes to the 

machine). The procedure must be performed by a Qualified 

Person .
Daily Checkout: The procedure for “daily” checkout of the EZ-

SCREEN Point System is to be performed at each shift change 

or machine setup change, whenever the System is powered up, 

at least daily. The procedure may be performed by a Designated 

Person or a Qualified Person.
Semi-Annual Checkout: The procedure for initial checkout of

the EZ-SCREEN Point System is to be performed at every six 

months, following installation of  the System. The procedure 

must be performed by a Qualified Person.

6. Periodic Checkout Procedures

6.2 Trip Test

Once the Beam Status indicator is steady Green, trip test the 

EZ-SCREEN System to verify proper operation and to detect 

possible reflection problems, using the test piece included with 

the System. With power ON:
1.   Verify that the EZ-SCREEN Point System is in Run mode; 

receiver status indicators should be as follows:

Status indicator

Green

Beam Status indicator Green

  Reset indicator 

ON

  Diagnostic Display 

“–” (Trip Output mode) or 

   

“L” (Latch Output mode)

2.   Pass the test piece downward through the beam at three 

points: near the receiver, near the emitter, and midway 

between them. In each case, verify that the Beam Status 

indicator on the receiver turns steady Red and remains steady 

Red while the test piece is blocking the beam. Also, verify that 

the Status indicator is steady Red while the beam is blocked. 

If the emitter and receiver are far apart, a second person may 

be needed to monitor the indicators while the test piece is 

used near the emitter or in the midway position.

Emitter

Test Piece

Receiver

Figure 6-1. EZ-SCREEN Point trip test

Advertising
This manual is related to the following products: