06 servicing hand torch components, Servicing hand torch components -7, And the type of operation. refer to section "7.06 – Tweco PAK 200i User Manual

Page 75: Pak 200i

Advertising
background image

PAK 200i

Manual 0-5335

TORCH INFORMATION

7-7

7.06 Servicing Hand Torch Components

A. Removing Torch Switch and Torch Head Assembly

Removing the torch control switch assembly requires gaining access to the switch wiring and partially disas-

sembling the torch handle, as follows:

1. Remove the shield cup, tip, gas distributor and electrode from the Torch Head assembly.

�. Roll the torch switch sheath back over the handle to expose the tape covering the torch switch connectors.

NOTE

Use a soap and water solution on the sheath to assist in rolling.

Sheath

Connectors From

Torch Switch

Torch Handle

Torch Control

Switch

A-02196

Threaded Locking Nut

Figure 7-5: Switch Wiring

3. Carefully cut and remove the tape from the leads and the end of the leads sheathing.

4. Slide the sheathing back to expose the torch switch connectors.

5. Remove the tape securing the two connectors together.

6. Disconnect the torch switch leads.

NOTE

The torch switch connectors are made to fit into the matching connectors.

7. Remove torch from handle.

NOTE

Keep the lock nut threaded on the Torch Head.

8. Disconnect all four leads to disconnect the Torch Head.

9. Remove Torch Head assembly.

Advertising