Section 3 system: installation, 01 unpacking, 02 lifting options – Tweco 102 Cutmaster User Manual

Page 23: 03 opening the contactor cover, Section 3 system, Installation -1, 01 unpacking -1 3.02, Lifting options -1, Opening the contactor cover -1, Cutmaster 102

Advertising
background image

CUTMASTER 102

Manual 0-4997

INSTALLATION

3-1

SECTION 3 SYSTEM:

INSTALLATION

3.01 Unpacking

1. Use the packing lists to identify and account for each item.

2. Inspect each item for possible shipping damage. If damage is evident, contact your distributor and / or shipping com-

pany before proceeding with the installation.

3. Record Power Supply and Torch model and serial numbers, purchase date and vendor name, in the information block

at the front of this manual.

3.02 Lifting Options

The Power Supply includes a handle for hand lifting only. Be sure unit is lifted and transported safely and securely.

!

WARNING

Do not touch live electrical parts.

Disconnect input power cord before moving unit.

FALLING EQUIPMENT can cause serious personal injury and can damage equipment.

HANDLE is not for mechanical lifting.

• Only persons of adequate physical strength should lift the unit.

• Lift unit by the handles, using two hands. Do not use straps for lifting.

• Use optional cart or similar device of adequate capacity to move unit.

• Place unit on a proper skid and secure in place before transporting with a fork lift or other vehicle.

3.03 Opening the Contactor Cover

The input power cord is connected to the main contactor, the contactor is located inside a box with a snap on cover. The cover

is held in place with two or more snap lock tabs. To remove the cover release the front latch and tilt the cover up about ½ inch.

Then squeeze both sides of the cover and lift it straight up. See the Primary Input Power Connections section for the necessary

changes to the Contactor. Remember to replace the Contactor Cover when the changes are complete.

Art# A-11478

1

2

2

1

Contactor cover

Advertising