Assembly – Viking Pump TSM141.2: LS-M 125/4125 User Manual

Page 5

Advertising
background image

SECTION TSM 141.2

ISSUE

F

PAGE 5 OF 12

ASSEMBLY

1. Install bracket bushing. If bracket bushing has a

lubrication groove, install bushing with groove at 6:00

o’clock position in bracket. If carbon graphite,

Refer to

Installation of Carbon graphite Bushings, page 11.

2. Coat shaft of rotor shaft assembly with non-detergent

SAE 30 weight oil. Start end of shaft in bracket bushing

turning from right to left, slowly pushing rotor in casing.

9. Remove packing and packing retainer washer.
10.

Clean all parts thoroughly and examine for wear and

damage. Check lip seals, ball bearing, bushings and idler

pin and replace if necessary. Check all other parts for

nicks, burrs, excessive wear and replace if necessary.

Wash bearings in clean solvent. Blow out bearings with

compressed air. Do not allow bearings to spin; turn them

slowly by hand. Spinning bearings will damage race

and balls. Make sure bearings are clean, then lubricate

with non-detergent SAE 30 weight oil and check for

roughness. Roughness can be determined by turning

outer race by hand.
If bearings have roughness, bearings will need to be

replaced.

11.

Casing can be checked for wear or damage while

mounted on bracket.

gREASE fITTINg LOCATION

INNER SPACER COLLAR

OUTER SPACER COLLAR

LOCKWASHER

SETSCREWS

OUTER END CAP

LOCKNUT

INNER LIP SEAL

HALf ROUND RINgS

INNER END CAP

NYLON INSERT

SHAfT

BALL BEARINg

BRACKET

OUTER LIP SEAL

3.

Place packing retainer washer in bottom of packing

chamber and pack pump with new packing. Use packing

suitable for liquid being pumped. Install packing,

staggering the joints from one side of shaft to other.

Lubricate packing rings with oil, grease or graphite to aid

assembly. A length of pipe will help to seat each packing

ring.

4. Install packing gland, capscrews and nuts. Back rotor

and shaft out of casing just far enough to insert packing

gland through side opening of bracket over end of

shaft. Make sure gland is installed square and nuts are

tightened evenly. Tighten nuts wrench tight then back off

until gland is slightly loose

.

5.

Coat idler pin with non-detergent SAE 30 weight oil and

place idler and bushing on idler pin in head. If replacing

with carbon graphite bushing,

Refer to Installation of

Carbon graphite Bushings, page 11.

6. Using a .010 to .015 inch head gasket, install head and

idler assembly on pump. Pump head and casing were

marked before disassembly to insure proper reassembly.

If not, be sure idler pin, which is offset in pump head,

is positioned toward and equal distance between port

connections to allow for proper flow of liquid through

pump.

fIgURE 5

Advertising