Wheatheart X Series 13 Augers User Manual

Page 66

Advertising
background image

3. A

SSEMBLY

W

HEATHEART

- X13 S

ERIES

A

UGERS

3.16. I

NSTALL

L

OW

P

ROFILE

I

NTAKE

H

OPPER

X1374, X1384, X1394

66

30787 R1

1. Attach the transition to the intake hopper with two 5/8” x 1-1/2” bolts and 5/8”

locknuts (19600). DO NOT over-tighten; tighten to a slightly loose fit only as
these bolts act as pivot points (Figure 3.33).

Figure 3.33 Installing the Transition

2. Clean dirt and paint from inside the u-joint and flighting shaft end, grease the

shaft end, then insert a Woodruff key (Figure 3.34).

3. Raise and support the hopper tube spout head on a stand about 50” high.
4. Open the service door on the transition, then bring the tube and transition

together guiding the flight shaft into the u-joint (Figure 3.34).

5. Secure the tube to the pivot-connector on the hopper with twelve

7/16” x 1-1/4” bolts and 7/16” locknuts.

6. Tighten set screws on u-joints, then close and secure the service door.

Table 3.14. Parts Required, Install Low Profile Intake Hopper

Part Number

Description

Amount

29978

Low profile hopper

1

20013

Spout head and tube

1

29977

Transition

1

20051

Cable attach bracket

1

17522

Wheel

4

-----

Wheel pins

4

29980

Inspection hatch bar

1

-----

Hairclip connectors

1

19224

Woodruff key

1

29166

Spout head retainer

4

29152

Spout head spacer

4

19538

5/16” x 3/4” bolt

10

18698

7/16” x 1-1/4” bolt

15

17593

7/16” locknut

15

19590

5/8” x 1-1/2” bolts

2

19600

5/8” locknuts

2

5/8” X 1-1/2” BOLTS

5/8” LOCKNUT

5/8” LOCKNUT

TRANSITION

Advertising