6. Operation

6.1. PRE-OPERATION CHECKLIST

• Tighten all fasteners.
• Adjust and/or lubricate boot chain and hopper chain.
• Ensure auger rotates freely.
• Check that tire pressure is within the manufacturer’s specification.
• Ensure wheel bolt torque is within specification.
• Check hopper winch and lift cable for damage (fraying, kinking, unraveling).

Replace as required.

• Ensure cable anchor on the winch drum is tight.
• Check gearbox oil levels.
• Grease and clean machine if needed.
• Ensure hydraulic system is functioning, is free of leaks, and the hoses are not

pinched or kinked.

• Check that truss cables are free from damage (fraying, kinking, unraveling).

Cables must be tight and properly adjusted for proper auger tube alignment.

• Ensure PTO shaft is properly installed.
• Ensure intake area and discharge spout are free of obstructions.
• Ensure tractor and auger are in line or as close to being in line as possible.
• Ensure tractor park brake is engaged and/or wheels are chocked.
• Ensure that axles are extended during auger operation.

WARNING Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.