Wheatheart WHR 80/100 x 31-71ft Augers PTO-SD User Manual

Page 10

Advertising
background image

2. S

AFETY

WHEATHEART - GHR & WHR GRAIN AUGERS

2.4. O

PERATION

S

AFETY

PTO-SD D

RIVE

M

ODEL

10

30641 R1

• Inspect lift cable before using auger. Replace if frayed or damaged. Make

sure it is seated properly in cable sheaves and cable clamps are secure.

• Operate auger on level ground free of debris. If ground is uneven, anchor the

auger to prevent tipping or upending.

• Augers are not insulated. Keep away from electrical lines. Electrocution can

occur without direct contact.

• Support the discharge end and/or anchor the intake end before operating to

prevent upending.

• Do not use auger as a hoist.
• Empty auger before raising or lowering.
• Lower auger at completion of operation or when not in use. Auger could drop

rapidly in case of cable break or hydraulic failure (where applicable).

• Keep the work area clean and tidy.

• Lock winch before operating auger.

Advertising
This manual is related to the following products: