Wheatheart WHR 80/100 x 31-71ft Augers PTO-SD User Manual

Page 24

Advertising
background image

3. A

SSEMBLY

WHEATHEART - GHR & WHR GRAIN AUGERS

3.5. S

HAFT

D

RIVE

G

EARBOX

PTO-SD D

RIVE

M

ODEL

24

30641 R1

2. Place gearbox assembly on auger tube, leaving a minimum 1/16” clearance

between chain coupler sprockets.

3. Secure gearbox assembly to auger tube with half-tube clamps and four

7/16” x 1" bolts and locknuts.

G

EARBOX

MOUNTING

PROCEDURE

FOR

THE

FOLLOWING

AUGERS

• 8" x 56’-61’-71'
• All 10" augers

These augers are equipped with chain couplers (pre-installed on gearbox).

See Figure 3.9.

1. Remove chain and secure half the chain coupler to driveshaft, using a

Woodruff key on 8" augers and a 1/4” x 1-1/2" square key on 10" augers.

Note:

It is easier to fill gearbox with oil when flat. Fill half full only; do not overfill. See
Table 3.4.

2. Place gearbox assembly on auger tube then reinstall chain, leaving 1/16”

clearance between chain coupler sprockets. Tighten set screw.

3. Secure gearbox assembly to auger tube with half tube clamps and four

7/16” x 1" bolts and locknuts.

Important:

Add EP90 lube oil to the gearbox before operating auger. Failure to do so will
void warranty. Do not overfill. Fill half full only.

Figure 3.8

Figure 3.7

Table 3.4

Auger

Oil Requirements

all 6”

196 ml

(7 fl oz)

8” (up to and incl. the 51’)

8” (56’ and up)

700 ml (25 fl oz)

all 10”

Advertising
This manual is related to the following products: