Operation, Pre-operational checklist, Auger drive & lockout procedure – Wheatheart WHR 80/100 x 31-71ft Augers PTO-SD User Manual

Page 45

Advertising
background image

WHEATHEART - GHR & WHR GRAIN AUGERS

5. O

PERATION

PTO-SD D

RIVE

M

ODEL

5.1. P

RE

-O

PERATIONAL

C

HECKLIST

30641 R1

45

5. Operation

5.1. PRE-OPERATIONAL CHECKLIST

Before operating auger each time, the operator must confirm the following:

• All fasteners are secure as per assembly instructions.
• PTO driveline is connected and secure.
• PTO driveline shield rotates freely.
• Lift cable is not frayed or damaged.
• Lift cable is properly seated in cable sheaves.
• Cable clamps are secure.
• Tube alignment is reasonably straight.
• Auger wheels are chocked, and if necessary, tractor wheels are chocked

or the parking brake has been engaged.

• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.

5.2. AUGER DRIVE & LOCKOUT PROCEDURE

WARNING Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

Drive Type

Before Operation

Lockout

PTO Driveline

Before starting, ensure:

• PTO driveline is securely attached to the

tractor and jackshaft

• tractor park brake is engaged and/or wheels

are chocked

• you are not exceeding the maximum operat-

ing length of 80” (2032 mm) of the PTO
driveline or maximum angle of 15°

• PTO drive on the tractor is in the off position

Shut off tractor’s engine
and remove key from
tractor.

• If removing key is

impossible, remove
PTO driveline from
tractor.

Advertising
This manual is related to the following products: