Winch handle, Caution – Wheatheart WHR 80/100 x 31-71ft Augers PTO-SD User Manual

Page 36

Advertising
background image

3. A

SSEMBLY

WHEATHEART - GHR & WHR GRAIN AUGERS

3.14. W

INCH

& L

IFTCABLE

PTO-SD D

RIVE

M

ODEL

36

30641 R1

Important:

Winch handle must be positioned on the left side of the auger (determine left by
standing at the intake end, facing the discharge end).

2. Attach

winch

to

winch mount with three 3/8” washer locknuts.

Important:

Winch handle must be positioned on the left side of the auger (determine left by
standing at the intake end, facing the discharge end).

Note:

If auger has more than 1 winch mount, use the bracket nearest the intake end.

3. Thread lift cable under and around roller on track shoe, then back to cable

attach rod welded to lower end of track.

Note:

On auger equipped with a lower angle-iron track stop, the cable must be
threaded between track stop and auger tube so cable rests on top of the track
stop (See Figure 3.24).

4. Wrap cable 1-1/2 times

around the cable attach rod
and secure with two 1/4”
cable clamps. Position
cable clamps as shown in
Figure 3.24 and 3.25.
Tighten clamps securely.

Note:

Make certain cable is properly seated in cable groove before raising auger.

3.14.1. W

INCH

H

ANDLE

This auger may use one of several different winch models. Before installing
handle on the main winch assembly, check the model number stamped on winch
housing and follow the correct set of instructions.

Figure 3.24

Figure 3.23

Figure 3.25

CAUTION

Winch handle assembly must follow the
instructions below. Improper assembly will
result in sudden winch failure causing
damage to equipment and/or personal injury.

Advertising
This manual is related to the following products: