Acremeter, Post assembly checklist – Great Plains 3S-4000F Predelivery Manual User Manual

Page 13

Advertising
background image

9/12/2009

195-242Q

11

Assembly

Acremeter

Assemble acremeter (1) to end of main drive shaft
on the center section as shown.

18922

1

Post Assembly Checklist

1.

Check that all working parts are moving free-
ly, bolts are tight, and cotter pins are spread.

2.

Check for proper tension and alignment on all
drive chains.

3.

Check that all safety decals and reflectors are
located correctly and legible. Replace if im-
properly located or damaged. Refer to “Safety
Decals” in the operator’s manual.

4.

Inflate tires to recommended pressure as list-
ed on the “Tire Inflation Chart,” page 29.
Tighten wheel bolts as specified on “Torque
Values Chart,” page 28.

Advertising
This manual is related to the following products: