Leveling the drill – Great Plains 3S-4000F Predelivery Manual User Manual

Page 24

Advertising
background image

3S-4000

195-242Q

9/12/2009

22

Leveling the Drill

Center Box Frame Leveling
1.

Park the drill on a clean level surface.

2.

Raise the openers and lock them up.

3.

Loosen the eight center box mount bolts (1),
four bolts on each side of tongue, see Figure
5,
and slide center box frame sideways until it
is centered with mainframe and transport ax-
le.

4.

See Figure 6. Measure the height of center
box opener frame pivots (2) from the level sur-
face and raise low end of box frame up until
both opener frame pivots measure the same
distance from the ground.

5.

Torque the 7/8 inch box mount bolts (1), Fig-
ure 5.

Figure 5

Center Box Mount Bolts

18873

1

1

Figure 6

Opener Frame Leveling

18874

2

Opener

frame

pivot

height

Advertising
This manual is related to the following products: