1000 rpm type 3 pto clearance, Install coupler, Caution – Great Plains PTO Kits 2-3-Section User Manual

Page 13: Ab c d

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

PTO Operation

9

2014-09-10

Table of Contents

Index

411-015M

1000 rpm Type 3 PTO Clearance
If the tractor PTO is not known to conform to Type 3
specifications, check the following pump-specific
clearance dimensions:

Refer to Figure 4
a.

Shaft to master shield top:
5.9 inches (15.0 cm) minimum
or hinged lid

b.

Shaft to master shield sides:
7.0 inches (17.8 cm) minimum

c.

Shaft to drawbar top:
8.6 inches (22.0 cm) minimum
13.75 inches (35.0 cm) maximum
It may be necessary to invert an offset drawbar, or
relocate or remove any clevis installed on the
drawbar.

d.

Shaft to ground:
16 inches (40.6 cm) minimum

Install Coupler

The 1000 rpm PTO kits require one of two
tractor-specific couplers, not included with the PTO kit:

826-777C 1 3/4-20 PTO COUPLER

826-778C 1 3/8-21 PTO COUPLER

Refer to Figure 5 (showing coupler 826-778C)
1.

Loosen both set screws (

and

) at the narrow

end of the coupler. Note that they are different sizes.

2.

Rotate the coupler until the internal keyway aligns
with the key on the pump shaft. Slide the coupler
onto the pump shaft.

3.

Tighten both set screws to the Grade 5 torque
specification for each thread size.

To remove or exchange a coupler at a later time, first
dismount the pump assembly from the tractor PTO shaft,
then loosen both set screws.

a

b

c

d

Figure 4:

Type 3 PTO Clearances

34845

818-240C Rev. A

To avoid Injury or

Machine Damage:

·Operate only with

1000 rpm PTO

CAUTION

Figure 5:

Secure Coupler to Pump

36315

258

309

310

257

258

309

310