Great Plains 2S-2600HDF Operator Manual v1 User Manual

Page 3

Advertising
background image

Great Plains Manufacturing, Inc.

Cover

Index

iii

2014-05-16

Cover

Index

195-440M

©

Copyright 2000, 2006, 2007, 2009, 2010, 2012, 2013, 2014 All rights Reserved

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.

Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.

Registered Trademarks of Great Plains Manufacturing, Inc. include:

Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand,

Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo Max, Turbo-Till, Ultra-Till, Verti-Till, Whirlfilter, Yield-Pro.

Brand and Product Names that appear and are owned by others are trademarks of their respective owners.

Printed in the United States of America

Table of Contents

Important Safety Information ......................................1
Safety Decals .................................................................6
Introduction ................................................................11
Document Family .........................................................11
Description of Unit ........................................................11

Intended Usage ........................................................11
Models Covered .......................................................11

Using This Manual........................................................12

Definitions.................................................................12

Owner Assistance ........................................................13
Preparation and Setup ...............................................14
Pre-Setup Checklist......................................................14
Hitching ........................................................................14
Electrical Connections..................................................16
Hydraulic Hose Hookup................................................17
Check Drill Level ..........................................................17
Setting the Bypass Valve .............................................18
Adjusting the Counter Balance Valve...........................19
Marker Setup................................................................20
Point Row Cab Module.................................................20
Shaft Monitor Cab Module............................................21
Scraper Installation.......................................................21
Operating Instructions...............................................22
General Description......................................................22
Pre-Start Checklist .......................................................23
Raising and Lowering Openers ....................................23

Opener Lock Up .......................................................23

Lock Up Openers..................................................23
Lowering Openers ................................................24

Raising Drill (Transport Lift)..........................................24

Transport Lift ............................................................24

Folding..........................................................................25
Transport ......................................................................27

Weights for Tractor Requirements............................27
Marker Transportation ..............................................27
Transport Checklist...................................................28

Unfolding ......................................................................29
Lowering Drill (Transport Lift) .......................................30

Transport Lower .......................................................30

Opener Operation.........................................................31

Active Hydraulic Systems .........................................32
Priority Flow Hydraulic Systems ...............................33
Non-Active Hydraulic System ...................................33

Loading Main Seed Box ...............................................35

Main Seed Box Loading ........................................... 35
Small Seeds Box Loading ........................................ 35
Initial Seeding Depth ................................................ 36

Fertilizer Box Operation ............................................... 36

Seeding and applying fertilizer ................................. 36

Divided Capacities ............................................... 37
Divider Removal ................................................... 37

Seeding with Both Compartments............................ 39

Marker Operation ......................................................... 40

Single Marker Operations ........................................ 40
Dual Marker Operations ........................................... 40

Lift Selector Valve Operation ....................................... 41
Point Row Operation .................................................... 41
Shaft Monitor Operation ............................................... 42
Electronic Acremeter.................................................... 42
Field Operations........................................................... 43

Final Field Checklist ................................................. 43
Planting Sequence ................................................... 43

Parking......................................................................... 44

Parking with Drill Unfolded ....................................... 44
Parking with Drill Folded .......................................... 44

Storage ........................................................................ 45
Adjustments ............................................................... 46

Seed and Fertilizer Rate ...................................... 46
Planting Depth...................................................... 46

Setting Main Box Seed Rate ........................................ 47
Position Seed Cup Doors............................................. 47
Setting Fertilizer Rate .................................................. 48
Small Seeds Rate ........................................................ 48
Frame Level ................................................................. 49
Frame Weight .............................................................. 50
Opener Frame Down-Force ......................................... 51
Opener-Subframe Adjustment ..................................... 52

Normal Down Pressure below 2100 psi ............... 52
High Down Pressure above 2100 psi ................... 52

00 Row Unit Adjustments............................................. 54
00HD Row Unit Adjustments ....................................... 55

Opener Height.......................................................... 56
Row Unit Down Pressure (Spring) ........................... 56
Disk Blade Adjustments ........................................... 57

Adjusting Disc Contact ......................................... 57

Disk Scraper Adjustments........................................ 58
Seed Firmer Adjustments......................................... 58

Keeton Seed Firmer Adjustment .......................... 58
Seed-Lok™ Seed Firmer Lock-Up ....................... 59

Advertising
This manual is related to the following products: