Link tube, Tool bar height, Link tube tool bar height – Great Plains 2S-2600HDF Operator Manual v1 User Manual

Page 78

Advertising
background image

74

2S-2600/F/HD/HDF

Table of Contents

Index

Great Plains Manufacturing, Inc.

195-440M

Table of Contents

Index

2014-05-16

Link Tube

Refer to Figure 79
The link tube controls folding height of outer end of drill
box. If a drill box does not catch in folding latch when
folding, adjust link length to lower or raise end of box.

1.

Unfold and lower drill.

2.

Pull upper pin

from link clevis

.

3.

Unlock jam nut

.

4.

Thread clevis in or out to lengthen or shorten link.

5.

Replace pin and tighten nut.

Tool Bar Height

Refer to Figure 80

Tool bar height

above ground level

is factory set

and normally does not require adjustment. If you tear
down the drill for repair, or if the tool bar is visibly not
level, spacer washers

on vertical pivot pins allow for a

small amount of tool bar-height adjustment.

To check tool bar height, park drill on a level surface, and
check for correct tire inflation. Measure from ground to
horizontal pivot pin

. If dimension on either side of drill

varies more than

1

4

inch (6.4mm), adjust tool bar height.

To adjust tool bar height, reposition spacer washers

.

First lower openers and set enough opener down
pressure to help balance frame. Raise tool bar by
removing spacer washers from top of the vertical pivot
and placing them on bottom side of pivot. Lower tool bar
by removing spacer washers from bottom of vertical pivot
and placing them on top of pivot.

Figure 79

Link Tube Adjustment

17307

1

2

3

1

3

2

Figure 80

Tool Bar Height

17306

3

1

2

3

1

2

3

1

3

Advertising
This manual is related to the following products: