Field operations, Final field checklist, Planting sequence – Great Plains 2S-2600HDF Operator Manual v1 User Manual

Page 47: Final field checklist planting sequence

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

43

2014-05-16

Table of Contents

Index

195-440M

Field Operations

This section presumes that all pre-operation checks have
been made on both tractor and drill, and drill is loaded
with seed and any treatments.

Final Field Checklist

Planting Sequence

1.

Lower drill openers at initial seeding point.

2.

Pull forward and begin planting.

3.

Raise drill for turns (meters stop automatically).

❑ Drill hitched, chained and unfolded. See page 14

and page 29.

❑ Set seed and fertilizer drives per charts and calibra-

tion. See page 47 and page 48.

❑ Set drill selector valves (if present) to Markers and

Opener Lift. See page 40 and page 41.

❑ Record acremeter reading if acreage monitoring is

desired.

❑ If installed, Shaft Monitor power ON.
❑ If installed, Point Row Control module ON, and set

for either ALL or SECTION CONTROL.

Advertising
This manual is related to the following products: