Unfolding – Great Plains 2S-2600HDF Operator Manual v1 User Manual

Page 33

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

29

2014-05-16

Table of Contents

Index

195-440M

Unfolding

Certain Tire Damage:
Do not lower openers until drill in unfolded or you will
damage drill tires.

Drill must be left raised (transport and opener lift) prior to
unfolding.

1.

Verify that the site has clearance needed to unfold
drill.

2.

If equipped with markers, set Marker/Fold valve at
hitch to Fold.

3.

Verify that the Transport Lift circuit is still raised, and
transport cylinder lock channels are installed.

Refer to Figure 23
4.

Verify that the opener sub-frames are still raised and
locked up (handles in ROAD position).

Refer to Figure 27
5.

At fold latch, prop both latch pawls

on the wing

pins, raising the latches

off the pins.

6.

Slowly supply oil to base end of fold circuit. Unfold
wing frames by completely extending fold cylinders.

If field operations are planned:

7.

Lower drill mainframe. See “Unfolding” on page 29.

8.

Lower opener subframe. See “Lowering Openers
on page 24.

Figure 26 - Unfold

Opener Unlock

15549

1

2

Figure 27

Latch Ready for Unfold

17319

1

2

Advertising
This manual is related to the following products: