Vermont Casting DBT36 User Manual

Page 13

Advertising
background image

10002789/0

-13-

DBT33/DBT36/DBT39

V

ERTICAL

S

IDEWALL

I

NSTALLATIONS

STEP 1

Locate vent opening on the wall. It may be necessary to

rst position the replace and measure to obtain hole location.

Depending on whether the wall is combustible or non-combus-

tible, cut opening to size. (Fig. 22)
(For combustible walls rst frame in opening. Fig. 22).

COMBUSTIBLE WALLS : Cut a 9-3/8"H x 9-3/8"W (240

mm x 240 mm) hole through the exterior wall and frame as

shown (Fig. 22).
NON-COMBUSTIBLE WALLS : Hole opening should be

7.5" (190 mm) in diameter.
STEP 2

Measure wall thickness and cut zero clearance sleeve parts to

proper length (MAXIMUM 12” / 305 mm). Assemble sleeve

and attach to restop with #8 sheet metal screws (supplied).

Install restop assembly (Fig. 23).
Zero clearance sleeve is only required for combustible walls.

STEP 3

Place replace into position. (Fig. 24). Measure the vertical

height (X) required from the base of the ue collars to the

centre of the wall opening.

STEP 4

Apply a bead of silicone to the inner and outer ue collars of

the replace and using three (3) screws attach an appropriate

length of vent to the replace. Follow with the installation of

the inner and outer elbow, again secure joints as described in

the section 'Joining DV Components'.
STEP 5

Measure the horizontal length requirement including a 2" (50

mm) overlap, i.e. from the elbow to the outside wall face plus

2" (50 mm)(or the distance required if installing a second 90º

elbow. (Fig. 25).
Always install horizontal venting on a level plane.

Fig. 22

Fig. 23

Fig. 24

Fig. 25

Advertising
This manual is related to the following products: