Vermont Casting DBT36 User Manual

Page 17

Advertising
background image

10002789/0

-17-

DBT33/DBT36/DBT39

V

ERTICAL

T

HROUGH

-T

HE

-R

OOF

I

NSTALLATION

1. Locate your replace.
2. Plumb to centre of the (4") ue collar from ceiling above

and mark position.

3. Cut opening equal to 9-3/8" x 9-3/8" (240 mm x 240 mm).
4. Proceed to plumb for additional openings through the

roof. In all cases, the opening must provide a minimum of

1 inch clearance to the vent pipe, i.e., the hole must be at

least 9-3/8" x 9-3/8" (240 mm x 240 mm).

5. Place replace into position.
6. Place restop(s) #7DVFS or Attic Insulation Shield

#7DVAIS into position and secure. (Fig. 35)

7. Install roof support (Fig. 36) and roof ashing making

sure upper ange of ashing is below the shingles. Fig.

37.

8. Install appropriate pipe sections until the venting is above

the ashing. (See Fig. 37).

9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. Fig. 38.
11. Apply high temperature sealant to 4" and 7" collars of

vertical vent termination and install.

If there is a room above ceiling level, restop

spacer must be installed on both the bottom and

the top side of the ceiling joists. If an attic is

above ceiling level a 7DVAIS (Attic Insulation

Shield) must be installed.

The enlarged ends of the vent section always

face downward, Fig. 37.

Fig. 35

Fig. 36

Fig. 37

Fig. 38