Two Brothers Racing Kawasaki Concours 14 User Manual

Page 4

Advertising
background image

ITBR001-192

2008-10 Concours 14 - 4


Fi

gu

re

D

Fi

gu

re

E

Fi

gu

re

F

ground

6

Attach the Juice Box Pro harness to the stock wiring harness and the throttle bodies
as shown in Figure D.

7

Attach the ground wire from the Juice Box Pro to the engine case bolt as shown in
Figure D.

8

Reinstall the coolant bottle.

9

Using the supplied velcro, secure the Juice Box Pro to the relay bracket as shown in
Figure E.

Use this installation location for 2010 models.

10 Using the supplied velcro, secure the Juice Box Pro to the left hand ram air tube.

Make sure to clean both surfaces with the alcohol swab before attaching.

11 Reinstall the inner fairing and the left hand fairing.

12 Reinstall the cover.

Advertising