Correct handing of device – Detex V50 EE User Manual

Page 11

Advertising
background image

104832 Page 11

Right Hand Reverse (RHR)

NOTE:

If link is not in uppermost position on the centerlift, carefully remove "E" clips and reposition link

on top pin of the centerlift and replace "E" clips. (An additional "E" clip is provided on opposite link pin.)

Verify carriage moves up and down smoothly when pushpad is depressed and released.

NOTE: LINK SHOULD ALWAYS BE IN TOP POSITION

1. Top rod may require cutting if centerline of

device is over 40" from finished floor, or if a

non-standard frame is used.

2. To determine rod length: Undog device

and measure the distance from the bottom

edge of the top latch bracket to the top of the

rod carriage. Add 1 3/4" for the rod length.

Insert top rod into top latch

until it stops.

Tighten

setscrews FIRMLY

FIG. 9

TOP LATCH

DETAIL

In normal latched

position, rod

connector block

must rest on

plastic bumper

FIG. 8A

NOTE HANDING

INDICATOR ON

CENTER LIFT

LINK

NOTE: If removed, be sure

to replace screws after

adjustment.

These screws MUST be

used.

Left Hand Reverse (LHR)

CORRECT HANDING OF DEVICE

Bottom edge of

top latch

Rod

Guide

slot in

carriage

1/4 20 x 1/4"

Screws

P/N 101621-5

NOTE: If removed, be sure

to replace screws after

adjustment.

These screws MUST be

used.

Advertising