EFCO 8800 Series Assembly Instructions Vol.5 User Manual

Page 18

Advertising
background image

EFCO 2009

Page 18

Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5

Section 20 - Unit Glazing Preparation - Vent at Fixed Horizontal

Figure 65

Apply gaskets

flush with the side

of the mullions.

Isolator
Reglet

Insert a 3/8” backer rod into isolator reglets to

keep free of sealant. Remove the backer rod

immediately, before sealant begins to skin over.

Figure 20

Figure 21

4. Apply the WC18 spacer gasket to the mullions as shown below and on the previous page. The gaskets will run through as shown below. Butt the gaskets

together at the corners (see Figure 22). “Crowd” in extra gasket, (approximately 4% to 5% extra) where it runs between the gaskets to ensure a snug butt
joint at the corners. It is important that there are no gaps in the gaskets where they meet in the corners. Note that the gasket is not symmetrical, and must
be installed so that it is flush with the side of the mullions (see Figure 20).

5. A 3/8” backer rod should be applied into the isolator reglet to prevent sealant from getting into the reglet. Remove the backer rod immediately after the

sealant is applied, and before the sealant begins to cure or skin over (See Figure 21).

SILL

INTERMEDIATE

HEAD

Butt gaskets at D.L.O.

corners (vertical

gasket runs through).

JAMB

JAMB

JAMB

Figure 22

Butt gaskets at D.L.O.

corners (vertical

gasket runs through).

Butt gaskets at D.L.O.

corners (vertical

gasket runs through).

Advertising
This manual is related to the following products: