EFCO 8800 Series Assembly Instructions Vol.5 User Manual

Page 50

Advertising
background image

EFCO 2009

Page 50

Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5

Section 25 - Captured Vent Unit Glazing at Stack Sill : C. Adapter Installation

Figure 85

HEAD

SILL

17. Slide WS00 vent surround gasket into the 17A2 glazing adapter, and apply the adapter to the vent head. See Figures 85 and 86.
18. Insert HS31 setting blocks at quarter points, or per the approved shop drawings, between the glazing and the 17A2 adapter at the vent head. See Figures

below.

19. Apply the 17L2 concealed vent cover to the 17A2 glazing adapter at the vent head. See Figures 85 and 86.
20. Drive in WC22 wedge gaskets as shown in Figure 86. The gaskets should be applied starting in the center of the D.L.O., and then working from the ends,

work the gaskets in place to the center of the lite.

Slide WS00 gasket into
17A2 adapter, and apply the
adapter to the vent head.

Figure 86 - Vent Head

WC22 Wedge

Gasket

17A2 Glazing

Adapter

WS00 Vent

Surround

Gasket

17L2

Concealed

Vent Cover

(2) HS31

Setting Blocks

Apply (2) HS31

Setting Blocks

Apply the 17L2 concealed
vent cover to the 17A2
glazing adapter and drive
in WC22 wedge gasket.

Advertising
This manual is related to the following products: