Inspection and Start-up Checklists

 Unit received
 Unit received complete as ordered including accessories

Handling and Installing

 Unit mounted on solid level surface

 Sufficient space allowed for access to unit and accessories

 Proper electrical service provided
 Hot water provided to humidifier

 Drain lines and trap installed properly

 Ductwork, fittings and grilles installed properly

 All cold duct surfaces insulated

 Low ambient control included if freezing condition present
No obstructions to air flow to condenser

Starting-up the Unit

 General visual inspection looks good
All wiring connections checked
 All ducts, grilles and panels in place

 Start unit

 Check ducts and connections for air leaks

 Balance air distribution

 Confirm condenser airflow is unrestricted

 Verify cooling and heating operation

 Check for excessive noise or vibration