Powering on cisco iad2430 series iads, Checklist for power-on, Power-on procedure – Cisco IAD2430 User Manual

Page 73: C h a p t e r

Advertising
background image

C H A P T E R

4-1

Cisco IAD2430 Series Integrated Access Devices Hardware Installation Guide

OL-4234-06

4

Powering On Cisco IAD2430 Series IADs

To power on your Cisco IAD2430 series integrated access device (IAD), perform the following tasks in
the order listed, as required:

Checklist for Power-On, page 4-1

Power-On Procedure, page 4-1

Initial Configuration Procedures, page 4-2

Troubleshooting, page 4-9

Checklist for Power-On

You can power on a Cisco IAD if it meets the requirements described in

Chapter 3, “Installing

Cisco IAD2430 Series IADs”

:

The chassis is securely mounted.

The power cable is connected.

The interface cables are connected.

Power-On Procedure

Perform the following procedure to power on your Cisco IAD and verify that it completes its
initialization and self-test. When this is finished, the Cisco IAD is ready to configure.

To power on the Cisco IAD, follow these steps::

Step 1

Power on your terminal or PC, and configure it for 9600 bps, 8 data bits, 1 stop bit, no parity, and no
flow control.

Step 2

Move the Cisco IAD power switch to the ON position (Cisco IAD2430 through Cisco IAD2432 IADs
only).

The green LED beside the auxiliary (AUX) port should come on, and the fan should operate.

Note

The Cisco IAD2435 IAD does not have a fan.

To power on the Cisco IAD2435 IAD, plug in the external power supply (see

Figure 3-19

).

Advertising