Installation – KEYENCE LB-70(W) Series User Manual

Page 8

Advertising
background image

8

Mounting hole

Pull the claw in
the direction of
the arrow.

a

b

c

Fastening ring

INSTALLATION

1. Controllers can be attached on DIN rails. Pull the claw at the bottom

in the direction of the arrow when installing or removing controllers.

2. LB-70(W)

Turn the fastening ring to connect the
connectors. Turning the cable may
cause disconnection.

LB-72(W)
When attaching the connector, gently
press the plug into the receptacle and
rotate the plug right and left to locate the
engaging position. Insert the plug until
you hear a clicking sound.
When removing the connector, hold the
connection sleeve as shown in the figure
on the left and pull the connector out in
the direction indicated by the arrow.

3. Confirm the mutual interference area below when using sensor heads

side by side.

Mutual interference area

When an object to be measured consists of differently colored portions
or different materials separated by a border line, the measurement result
may vary depending on the installation direction of the sensor. To
minimize deviation of the measurement, install the sensor parallel to the
border line as shown in the figure below.

a

b

c

LB-70(W)

65 mm

50 mm

90 mm

LB-72(W)

45 mm

20 mm

35 mm

Advertising