10 unpacking and installing the unit, Ab c, Am series boilers and water heaters – AERCO AM Series Boiler User Manual User Manual
Page 32
Advertising
AM Series Boilers and Water Heaters
CHAPTER 3 – INSTALLATION
Page 32 of 156
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
OMM-0100_0B
PRI - 07/14/14
Ph.: 800-526-0288
GF-146
3.10 Unpacking and Installing the Unit
Unpacking Instructions
1. Remove the outer shipping carton from the water heater.
2. Remove the lower front cover “A” at front of the unit by pulling it forward to access and
remove the screw and washer “B” (Figure 3-3).
Figure 3-3: Removing the Unit from Wood Pallet (Front)
3. Remove the screw and washer “C” at the rear of the unit (Figure 3-4).
Figure 3-4: Removing the Unit from Wood Pallet (Rear)
A
B
C
Advertising