INSTALLATION

2-1

CHAPTER 2 INSTALLATION

2.1 INTRODUCTION

This Chapt er pr ovides t he d escriptions a nd

procedures nec essary t o unpack, ins pect an d

install the AERCO Benchmark 3.0 Boi ler. Br ief

descriptions are also provided for each available

mode of oper ation. Det ailed procedures f or

implementing th ese m odes ar e pr ovided in

Chapter 5.

2.2 RECEIVING THE UNIT

Each Benchmark 3.0 S ystem is s hipped as a

single c rated unit. T he s hipping weight is

approximately 2,170 pounds. T he un it m ust be

moved w ith the pr oper rigging equ ipment for

safety and to avoid equipment damage. The unit

should b e c ompletely inspected f or e vidence of

shipping damage and shipment completeness at

the t ime of r eceipt f rom the c arrier a nd before

the bill of lading is signed.

NOTE

AERCO is no t r esponsible f or los t or

damaged freight.

Each u nit has a T ip-N-Tell indicator on th e

outside of the crate. This indicates if the unit has

been t urned on its s ide d uring s hipment. If the

Tip-N-Tell indicator is tripped, do not sign for the

shipment. Not e th e information o n t he c arrier’s

paperwork and r equest a f reight c laim and

inspection b y a c laims adj uster bef ore

proceeding. A ny other v isual d amage to t he

packaging m aterials s hould als o be m ade c lear

to the delivering carrier.

2.3 UNPACKING

Carefully unpack the unit tak ing c are not to

damage the un it enclosure when c utting away

packaging materials

A close inspection of the unit should be made to

ensure that there is no evidence of damage not

indicated by the Tip-N-Tell indicator. The freight

carrier s hould b e not ified im mediately if an y

damage is detected.

The f ollowing accessories c ome s tandard with

each un it and ar e eit her pack ed s eparately

within the unit’s packing container or are factory

installed on the boiler:

Pr essure/Temperature Gauge

Spar e Ignitor-Injector

Spare Flame Detector

ASME Pressure Relief Valve

Condensate Drain Trap & Adapter `

2” Gas Supply Shutoff Valve

When or dered, o ptional accessories may be

packed separately, pac ked with in the boiler

shipping c ontainer, or m ay be i nstalled on th e

boiler. A ny s tandard or opti onal ac cessories

shipped loose should be identified and stored in

a safe place until ready for installation or use.

2.4 SITE PREPARATION.

Ensure t hat t he s ite s elected f or ins tallation of

the Benchmark 3.0 Boiler includes:

Access to AC Inp ut Po wer corresponding to

the or dered po wer c onfiguration. T he

available power configurations are:

208 VAC, 3-Phase, 60 Hz @ 20 A

460 VAC, 3-Phase, 60 Hz @ 15 A

Access to Natur al G as line at a m inimum

static pressure of 3.5” W.C.(FM) or 4.0” W.C.

(IRI). M aximum static p ressure must n ot

exceed 2 psi.

2.4.1 Installation Clearances

The unit m ust be i nstalled with t he prescribed

clearances f or s ervice as shown in F igure 2-1.

The minimum clearance dimensions, required by

AERCO, ar e l isted below. Ho wever, if Loc al

Building Cod es r equire a dditional c learances,

these c odes s hall s upersede A ERCO’s

requirements. Mi nimum ac ceptable c learances

required are:

Sid es: 24 inches

Front : 24 inches

Rear : 43 inches

T op: 18 inches

All gas piping, water piping and electrical conduit

or c able m ust be ar ranged s o th at t hey d o not

interfere with the r emoval of an y panels, or

inhibit service or maintenance of the unit.