INSTALLATION

2-7

GND

NEU

L2

L3

L1

208 VAC, 3 PHASE

208 VAC, 3 Phase

GND

L2

L3

L1

460 VAC, 3 PHASE

460 VAC, 3 Phase

Figure 2-9

AC Terminal Block Configurations

2.9 MODES OF OPERATION AND FIELD
CONTROL WIRING

The Benchmark 3.0 Boiler is available in several

different modes of operation. While each unit is

factory c onfigured an d wired f or its intend ed

mode, s ome addit ional f ield wir ing m ay be

required to c omplete the installation. This wiring

is t ypically c onnected t o t he I nput/Output ( I/O)

Box located on the lower portion of the unit front

panel ( Figure 2- 10) beh ind the r emovable f ront

door.

To access the I/O Box terminal strips shown in

Figure 2-10, loosen t he f our c over s crews an d

remove the c over. A ll f ield wiring is ins talled

from the r ear of the pa nel b y r outing th e wires

through one of the four bushings provided.

TERMINAL

STRIPS

LOWER RIGHT CORNER

OF FRONT PANEL

Figure 2-10.

Input/Output (I/O) Box Location


Refer to the wiring d iagram pr ovided on t he

cover of the I/O Box (Figure 2-11) when making

all wiring connections.

Brief des criptions of eac h mode of oper ation,

and the ir wiring r equirements, ar e pr ovided in

the f ollowing par agraphs. Additional information

concerning field wiring is provided in paragraphs

2.9.1 thr ough 2.9. 9. Ref er to Chapt er 5 f or

detailed i nformation on t he av ailable m odes of

operation