Installation – AERCO BMK 3.0 LN Nat. Gas Jan 2011 User Manual

Page 15

Advertising
background image

INSTALLATION

2-3

2.4.3 Removal of Support Rod

Prior to ins tallation of w ater supply a nd return

piping, the 24” threaded rod shown in Figure 2-3

must be r emoved. T his r od is installed pr ior to

shipment from the f actory to prevent damage to

the ins ulated m etal f lex h ose on the hot water

supply outlet of the boiler. In order to install the

water s upply piping, th is r od m ust be r emoved

as follows:

1. Refer to Figure 2-3 and back off the hex nut

on the outlet side of the flex hose.

2. Next, disconnect the coupling nut from the

flange stud.

3. Completely remove the threaded rod, hex

nut and coupling nut from the boiler.

5/8-11 x 24" LONG

THREADED ROD

5/8-11

HEX NUT

5/8-11

COUPLING NUT

EXHAUST

MANIFOLD

OUTLET

FLANGE

INSULATED
FLEX HOSE

(SEE IMPORTANT

NOTE BELOW)

PARTIAL TOP VIEW - REAR

Figure 2-3

Location of Threaded Support Rod

IMPORTANT

THE IN SULATED F LEX H OSE

SHOWN IN FIG URE 2- 3 M UST BE

LEVEL O R SLO PING UPWARD AS

IT EXITS THE BOILER. FAILURE TO

PROPERLY PO SITION T HIS HO SE

MAY CAUSE I

NEFFECTIVE AI R

ELIMINATION R ESULTING IN E LE-

VATED T EMPERATURES THAT

COULD CO MPROMISE T HE TOP

HEAD GASKET.

2.4.4 Removal of Strap and Packing
Material From Heat Exchanger

Prior to c onnecting th e ex ternal g as s upply or

electrical po wer to t he unit. the s trap and

packing material must be r emoved from the top

of the primary he at exchanger. T his m aterial is

located i n the area of the ig nitor-injector an d

staged ignition solenoid on the b urner assembly

This c an be eas ily accomplished b y r emoving

the top panel nearest to the front of the unit.

2.5 SUPPLY AND RETURN PIPING

The Benc hmark 3.0 B oiler uti lizes 4” 1 50#

flanges f or the water s ystem s upply a nd r eturn

piping connections. The physical location of the

supply and return piping connections are on the

rear of the unit as shown in Figure 2-4. Refer to

Appendix F, Dr awing A P-A-811 f or ad ditional

dimensional data.

BOILER SUPPLY

4" – 150# FLANGED

CONNECTION

BOILER RETURN

4" – 150# FLANGED

CONNECTION

2" GAS INLET

CONNECTION

SHELL DRAIN

VALVE

EXHAUST

MANIFOLD

REAR VIEW

Figure 2-4

Supply and Return Locations

2.6 CONDENSATE DRAINS

The Benc hmark 3.0 Boi ler is d esigned t o

condense water vapor f rom the f lue pr oducts.

Therefore, the ins tallation must have pr ovisions

for suitable condensate drainage or collection.

Two condensate drain connections are provided

on th e r ear of the u nit as shown i n F igure 2- 5.

One drain connection is located on the exhaust

manifold and th e oth er is loc ated on th e

connecting manifold.

The drain at th e bottom of the exhaust manifold

also i ncludes a c ondensate tr ap c ontaining a

float assembly. When condensate collects in the

exhaust m anifold, th e f loat r ises, ther eby

allowing i t to dis charge thr ough t he dr ain

opening. T he dr ain p ipe loc ated on t he

connecting m anifold m ust be c onnected to a

second c ondensate tr ap whic h is pac ked

separately within the unit’s shipping container.

Advertising